
Motorists are being advised of closures on Centenary Way next week as essential bridge maintenance works get underway.
The northbound carriageway will be fully closed between 8pm and 6am from Sunday 8 September to Thursday 12 September. During this period, the southbound carriageway will remain open but reduced to a single lane.
The works are expected to last five nights and are being carried out to ensure the long-term safety and condition of the bridge.
Drivers are urged to plan ahead, allow extra travel time, and follow all signed diversion routes in place throughout the works.
